But if you say 2% is normal then they are running at 10% excess due to COVID.
If extrapolated to the whole population that would mean 6 million people in the UK are sick or isolating!
And remember that is the number they want to bring it down to - the number is actually higher!

It sounds bullshit to me (or they are incredibly permissive in allowing sick)

1 Like

Perhaps Southern have just decided they don’t want to run services on this line and are chucking out some figures to support this.

2 Likes

The Littlehampton and East Grinstead trains which should run from Victoria ( 4 trains an hour) are still starting at London Bridge so presumably have bumped out are trains. So maybe when work is complete at Victoria we might get our trains back.
They stop at Norwood Junction which is handy for anyone going in the Littlehampton or East Grinstead direction!

Agree,
and as mentioned by @HannahM the Overground this morning and this evening was was packed! Standing room only by Honor Oak park going eastbound and only a handful of seats at forest Hill.
Coming back this evening there were no when I got on at Canada water and I’ve taken to using the stairs to platform 3 from the Jubilee Line because the queue from the escalator is so bad.

1 Like

Here’s a reply from my complaint to Southern:

"I appreciate the recent timetable changes have particularly impacted some passengers, and I’m sorry that’s the case. Just to explain the need for the changes, like many other industries across the country, Coronavirus continues to affect our people and disrupt our business, especially the widely reported new variant.

There are two main factors at play: the first is short notice absence due to track and trace mandated isolation and positive Covid tests. The second factor is the cumulative result of at least sixteen months of disruption. In particular, Coronavirus has had a knock-on impact on driver training, as social distancing limited numbers in the cab and the classroom. With regular staff turnover, there are now fewer people available than before the pandemic.

We’ve seen a similar impact on other critical roles including engineering teams, on-board crew and platform dispatchers. So, while our depots are fully staffed, the number of qualified crew that are available on a day-by-day basis is less than before the pandemic. In normal circumstances we’d cover small gaps through overtime; now, the number of people who are available and also have the right training is far smaller.

By reducing the number of trains in a planned way, the remaining train service will be more reliable for everyone and will mean you can still plan your day around your journey.

We’re needing to review the timetable on a weekly basis and we’ll do our best to introduce more services. If you haven’t already, please check out our webpage which we’ll keep up to date as and when changes will happen: Southern - Revised-timetable.

I hope this helps explain the current situation but, if you have any further queries or concerns, please don’t hesitate to drop me a line. Thank you again for getting in touch."

2 Likes

I mean our new train service IS reliable…

Reliably not there.

6 Likes

Yes, because we all have the freedom to pick our working hours…

2 Likes

The response from Southern does not address the zero service for us. I guess they didn’t bother to check the actual route and just assumed we have a reduced service rather than a non-existent service.

3 Likes

I’ve just posted details of the new Southern timetable that has been announced and updated in National Rail’s Journey Planner (It’s good news! :rofl:)

3 Likes

Yup! Spoke to my nephew who drives on that line. He said he did an evening peak train to West Croydon other day and people were being left behind at Canada Water, was mostly standing only from Whitechapel. So it’s not purely down to London Bridge services, just people returning to normality.

@Sherwood - They can turn them round at Canada Water. I was once on an Overground train that pulled into Canada Water on the southbound platform.

It can be done in out of course situations, such as extreme delays or problems with the line. In normal service though, it couldn’t work. There is a 6 minute minimum allowance for turning around a train (ie driver comes in to platform, lets people out, turns off train, walks to other end, sets ups train), which is way more than the current headway allows. If it were to be slotted in between trains, you’d have to double-man it, ie have another driver ready to go at the other end, which would mean increasing NXG depot drivers. Even if that were the case, there is a minimum allowance of 3 minutes to set up a train, That’s 2.5 minutes longer than currently used. It just genuinely can’t be integrated in to the timetable to have a timetabled Canada Water terminator.

There will be an increase to 18 trains per hour in either May or December this year though. Not sure where the extras will go, most likely Crystal Palace. They’ve already started works on new stabling sidings at New Cross (old LUL sidings) to accommodate the extra trains from rest of the network. Also will probably berth 2 trains at night at West Croydon platform 1, which is why some new security fencing is going up now there.

The New Bermondsey development planning application has been agreed in last week with Lewisham Council, so expect possible closures to the Clapham Junction line. Also Surrey Quays station upgrade is taking place, so if there are a lot of full line closures, it will be because of this. However, if there’s no service through Surrey Quays, there is absolutely no reason for there not to be a shuttle service between New Cross Gate/West Croydon/Crystal Palace. Unfortunately though, TfL own the line from from NXG to Dalston Junction and outsource the maintenance. South of NXG is Network Rail owned, so if Network Rail decide to do maintenance at same time as an ELL closure, there’s nothing TfL can do.

4 Likes

Also surely part of the issue is there are only so many trains that can go through the old East London line part. when I used to get the train from Shadwell there would often be congestion in that bit, particularly as over crowding meant there were boarding delays at Canada Water.

3 Likes

Apologies for going off topic, for obvious reasons I’ve been using the Overground recently, does Wapping station always smell like a sewer?

Pretty much, yes.

1 Like

My point was that you cannot extrapolate to the whole population like that. Not everyone is exposed in the same way and some occupations are way more unhealthy than others.

If course there is a lot of truth in that, but the number of employees is large enough to cover a broad section making direct extrapolation fairer. Even if I said they were ten times more unhealthy the numbers would still be silly

Of course train workers are safety roles so they should maintain a standard of fitness so they can execute those roles…

I work in a busy west end shop where even when masks were mandatory many customers didn’t bother and possibly as a result of this and and working when office workers were told to WFH many of my colleagues got covid or were isolating (In my department at one point before christmas out of 20 members of staff 12 had Covid )
HOWEVER at no point despite being extremely short staffed throughout December and January (our busiest times due to christmas and january sales) the shop never closed its doors we managed to trade with just about 2/3 of our workforce -I dont understand why Southern had to stop every train on our line except two before 7am and two after 11pm ‘due to sickness’ it doesn’t ring true.
In fact it smells like bull :poop:

1 Like

What is the source of this information, please? I can find references talking about the plans to run more trains in general but nothing that’s recent and/or has a date stated.

I’d love to see it happen, but with talks about TfL possibly having to close entire tube lines I find it hard to believe they would find the funds to put more trains on the Overground.

Perhaps the person responsible for transport within Lewisham could provide an official and factually correct response as to future improvements or cuts to Lewisham services? It’d be odd if they didn’t have this info to hand.

Also, referring to Flora’s note, would it be a good idea for someone to set expectations out for the OG when doing Surrey Quays station improvements? I can see they’ll try to close the entire line, quoting Surrey Quays station improvements as an excuse, when we know (well in advance) that they can provide the OG service south of New Cross Gate, thereby at least leaving us with the CW interchange.

They’ve definitely shut the whole line before, when they could have kept sections of it open.

We could set the bar high by letting the OG know in advance that it won’t be acceptable not to run the service south from NCG.

1 Like

Any extra Overground services would go to Crystal Palace because there isn’t the capacity to send more trains to West Croydon until the major remodelling of the Selhurst/Norwood Junction to East Croydon corridor which would untangle all the lines as what Network Rail did to London Bridge for the Thameslink Programme.

2 Likes

It’s good that network rail carry out out necessary maintenance and improvement works, but please not to the detriment of services from Forest Hill. Forest Hill services need to run to the schedule and no more excuses! We’ve had enough! Engineering works can take place on the night shift so as to avoid leaving Forest hill with no trains, as is standard in other London boroughs. No more service cancellations please!!

2 Likes